Extracted from ../entities/program-and-task.md.
- v0.2 — BR-review lock (2026-04-15). Locked 5 decisions: BR-100 (Tender-level, no Estimate); BR-104 (duration adopt-as-is from MS Project, no recalc); BR-105 (summary-task-only, no subtask exposure); BR-106 (re-upload conflict resolution via task ID + Import Wizard); dropped Beta cost-program linking. Phase: Alpha only. Status: 🟢 Locked.
- v0.1 — initial draft (Batch B). Consolidates glossary §9 (Tender Program), domain-model entries (Tender Program, Program Task), business rules BR-100 through BR-103, and production-rate interaction via BR-046. Adds three worked examples (simple link, supervision, parallel tasks). Phase: Alpha (parse/link only). Status: 🟡 Working.