Extracted from ../entities/adjudication.md.
🟢 Resolved (v0.2):
- BR-068a implementation detail — Normalisation rows remain transient JSON in Adjudication comparison state. No changes needed if already reflected.
- Supplier/Subcontractor role enforcement — LOCKED (BR-069). Validation at first gate: whichever of add Company or import return comes first.
- Re-opening constraints — LOCKED (BR-064). Constrained by Estimate state: cannot re-open after Estimate Submit.
- Multiple adjudications per resource set — LOCKED (BR-062 updated). PBA now supports multiple rounds like SPA for consistency.
- Adjudication return formats — LOCKED (BR-068b). Excel + Import Wizard (smart column mapping, preview validation).
- Variance/inclusion tracking detail — LOCKED (BR-068c). Captured as Content Block instances on affected Item Worksheets.