Extracted from ../../other/glossary.md.


Consolidated list of πŸ”΄ items pulled from the sections above. Others have been resolved internally β€” see change log.

  1. Text Block β€” distinct concept or a flavour of Heading?
  2. Indirect Cost β€” precise definition in Oxcon’s world; examples of items that sit under a Schedule Item but should be treated as indirect
  3. Flag taxonomy β€” full per-type flag lists (Labour, Material, Plant, Subcontract); locks in Resource spec
  4. Tender Program β€” confirm Tender-level (not Estimate-level)
  5. Anomaly Review β€” full list of checks to include at launch
  6. Rule scope targets β€” full list of what a Commercials rule can target
  7. Item depth β€” 5 levels is the cap, but is it realistic? What’s the typical max depth Oxcon uses?

Change log moved to changelog/glossary_log.md.