Extracted from ../entities/subcontract-package.md.


None. All three BR-review decisions are locked:

Resolved (v0.2):

  1. Estimate-scoped (M:1 Estimate) — Package belongs to exactly one Estimate; cross-estimate bundling NOT in v1 (BR-065).
  2. Item membership editable during Draft Adjudication — Items can be added/removed while current Adjudication is in Draft state; frozen when Adjudicated. Re-open Adjudication to Draft to modify Items (cascades to re-adjudication) (BR-065a).
  3. No pre-qualified Subcontractor list on Package — Package is purely a scope bundle (Items + name + description); supplier selection lives in the Adjudication workflow (BR-068 step 1: Generate) per BR-069a.